
Happy Lane
Design/Build (12) spec warehouse building shells that range from 10,000 square feet to 50,000 square feet, for a total of 210,000 square feet. Includes entitlement to subdivide single parcel into separate parcels to sell the buildings individually.
... [more]
Security Park Drive
This design build 1.85 acre site is comprised of four light industrial buildings. The buildings are concrete tilt-up construction and range from 5,000 sq feet to 10,000 sq feet and capable of being split in half with an interior dimising wall. The site is designed to allow for eight yards each accessible from a common drive isle as well as the building. The site will require complete build out as well as a sewer septic system. ... [more]
Coastal/KMS Commerce Center Existing Structure and Site Infrastructure
Work to include Site and Exterior Building Improvements:
Site Improvements: Demolition, Concrete curbs and sidewalk, Site Lighting, A.C. Paving and Landscaping
Building Exterior: Repairs and Upgrades to buildings exterior skin, storefront, entry doors and lighting.
... [more]
Coastal/KMS Commerce Center On-Site/Off-Site Infrastructure Improvements
Work to include improvements to a 40+ Acre Parcel in North Roseville located between Industrial Avenue and Washington Blvd near Pleasant Grove Blvd. Improvements include Grading, Underground Utilities, Concrete, Site Lighting, A.C. Paving and Landscaping. Improvements will also be made to existing roadways, pedestrian access and utilities serving both Industrial Blvd and Washington Avenue. The improvements noted will support the development of a light industrial / single story office commerce center. Of special note, the design team is researching and will implement into the project design the greatest practical level of “Low Impact” environmental measures. ... [more]
Buildings 9 and 10 – Milco Development
Work to include Site and Building Elements:
Two (2ea) Single-Story multi-tenant concrete tilt-up light industrial buildings. Structure provides a interior clear height of 16 ft and includes full height Metal Stud/Drywall constructed tenant space demising walls. Tenant spaces include Aluminum Storefront Systems, (1ea) 9ft x 15ft conditioned office space, (1ea) 7’-6” x 7’-6” Handi-Cap Accessible Restroom and (1ea) 12’ x 14’ Steel Roll-Up Door. Electrical services include (1ea) 200 Amp metered service and distribution panel.
Site Improvements: Concrete Curbs and Sidewalks, Site Lighting, A.C. Paving and Landscaping.
... [more]
Light Industrial Single-Story Concrete Tilt-Up Spec Buildings
Work to include Site and Building Elements:
Five (5ea) 10,000sf Single-Story Concrete Tilt-Up Construction Spec Buildings with public parking and yard area. Buildings to include (1ea) 8’-0” x 8’-0” Handi-Cap Accessible Restroom, Aluminum Storefront System and 12’ x 14’ Steel Roll-Up Doors at Service Bays. Future knock-out panels are deigned in to allow for future tenant modifications.
... [more]
Sunstate Rentals – Sales Building and Utility Yard
Work to include Site and Building Elements:
Sunstate Rentals to occupy a 3.86 Acre (Net) and will site a Single-Story Concrete Tilt-Up Rental/Sales office with Equipment Service Bays and Utility Yard area for Material and Equipment storage. Fuel Island (Gas, Diesel and Propane) and Equipment Wash Bay.
Site Improvements: Concrete Curbs and Sidewalks, Site Lighting, A.C. Paving and Landscaping.
Utility Yard: Paved yard area with Fueling Islands [Diesel, Gas and Propane] and Vehicle Wash Bay.
Structure: Single-Story Concrete Tilt-Up construction with both an Office/Sales area and Equipment Service Bays.
... [more]
Swim Center Facility
Work to include Site and Building Elements:
An All Weather Outdoor Swim facility designed for Recreational, Instructional and Competitive swimming activities. Center includes an Outdoor Swimming pool under an all weather glazed retractable roof system, locker rooms with showers, snack-bar and picnic area.
Site Improvements: Concrete Curbs and Sidewalks, Site Lighting, A.C. Paving and Landscaping.
Structure: Single-Story Concrete Tilt-Up construction with both an Office/Sales area and Locker Rooms with showers.
... [more]
California Bottling Company
Work to include Site, Interior and Exterior Building Improvements.
Site Improvements: Ugrade site lighting, reconfigured drive aisle, approach, parking and added loading dock facilities.
Building Interior: Re-configuration/Upgrade of existing offices and restrooms.
Building Exterior: Demolition of existing canopy and entry to office spaces.
... [more]